Start with roof area, not your home’s floor area
Roofers measure roof surface. Your home’s advertised square footage is not a substitute: slope, overhangs, attached garages and multiple stories can change the relationship. A roofing square means 100 square feet of roof surface.
Ask each contractor to identify the measured area, which roof sections are included and how waste is handled. Do not automatically add a waste percentage to every bid; first establish whether the contractor has already included it. Compare proposals using the same measurement basis.
Compare the same roofing solution
A shingle replacement, tile reset and new tile roof are different purchases. Before comparing totals, establish whether the proposed work solves the same problem.
| Option | Potential advantage | Trade-off to check |
|---|---|---|
| Asphalt shingles | Multiple material and warranty options | Exact shingle, underlayment and accessory specifications matter |
| Tile reset | Reuses suitable existing tiles while renewing waterproofing | Tile condition, breakage and replacement-tile availability need assessment |
| New tile roof | Replaces the tile covering as well as underlying components | Includes new-tile material costs and requires a clearly defined assembly |
| Low-slope roofing | Uses a system intended for low-slope roof sections | Compare membrane layers, flashing and drainage details, not shingle specifications |
Epic’s shingle roof replacement options include Malarkey Highlander Cool and GAF systems. For tile, compare tile roof reset with new tile roof replacement. For a low-slope addition or other flat section, request separate specifications for flat roof replacement.
Six scope items every estimate should explain
- Tear-off and disposal. Identify the roof sections and existing layers included, debris removal and property protection. Ask what happens if additional layers are discovered.
- Decking repairs. Get the included wood-replacement allowance in measurable terms. Request unit prices or a written pricing method for repairs beyond that allowance.
- Underlayment and waterproofing. Specify product names and installation scope, including valleys and transitions between roof types.
- Flashing and penetrations. Clarify replacement versus reuse around pipes, skylights, chimneys and roof-to-wall connections. Ask which related repairs are excluded.
- Ventilation. Identify proposed vents and how the contractor will evaluate the existing intake and exhaust arrangement. A vent count alone does not explain the plan.
- Permits, inspections and cleanup. State who obtains permits, schedules required inspections and provides closeout documentation. Include final cleanup and responsibility for correcting inspection issues.
Before accepting an exclusion, ask who will perform that work and whether it must happen before the roofing installation. An excluded item can still be necessary to complete the project.
Understand what can change the final price
Satellite measurements help establish roof size and geometry, but they cannot establish the condition of concealed decking. Some damage becomes apparent only after the existing roofing is removed.
Epic’s published roofing packages and pricing describe standard scopes and require a site inspection to assess unique conditions. The pricing terms identify extra roofing layers, damaged decking and city requirements as possible reasons for additional work. Package language such as partial wood replacement should be clarified in your written proposal rather than treated as unlimited coverage.
For Los Angeles-area projects, select Southern California, Residential and the correct roof type. Northern California pricing is a separate selection; do not carry a rate from one regional package into another. Confirm the applicable package and conditions instead of budgeting from an isolated advertised number.
Agree on a change-order process: photographs, an explanation, the price and your written approval before additional work proceeds, except for separately agreed emergency protection.
Account for local permits, cool roofs and weather
A Los Angeles mailing address does not establish the permitting authority. Confirm whether your property falls under the City of Los Angeles, another incorporated city or county jurisdiction. Do not assume the same reroof checklist applies in Burbank, Santa Clarita, Ventura County and Orange County.
The California Energy Commission says permit applications submitted on or after January 1, 2026, must comply with the 2025 Energy Code. Ask your roofer to identify the applicable energy and local cool-roof requirements and document the proposed product’s compliance. A product’s name alone is not a permit-ready compliance explanation.
Ready LA County’s rain guidance places storm season from mid-October through early spring and recommends clearing gutters, downspouts and storm drains and repairing roof leaks. For a fall replacement, ask about temporary weather protection, forecast-related scheduling and keeping drainage paths clear. That is sensible planning, not a prediction of an unusually wet winter.
Separate material coverage from workmanship coverage
A long material-warranty term does not tell you who pays to correct an installation error. Ask for the exact manufacturer warranty, the contractor’s workmanship terms, registration responsibilities, transfer rules and exclusions.
GAF explains that qualifying Golden Pledge coverage can address covered application errors, including specified flashings. That does not make every GAF installation eligible or every leak covered. Compare the actual documents offered with your proposed system, not just a warranty badge.
Frequently Asked Questions
The price depends on measured roof area, materials, tear-off, access and repair needs. Use the applicable Southern California package as a starting point, then obtain a written proposal that explains allowances and exclusions. A roof-specific quote is more useful than a citywide average.
It should identify measurements, products, tear-off, decking allowances, flashing, ventilation, permit responsibilities, cleanup, warranty terms and exclusions. Ask for a written method for pricing unforeseen work.
Have the roof’s condition assessed before scheduling solar. If replacement is needed, coordinate both contractors’ scopes and sequence so the roofing and panel work do not conflict.
For a City of Los Angeles reroof, plan for LADBS permitting and confirm the applicable process. Outside city jurisdiction, check with the responsible building department. Your proposal should assign permit and inspection responsibilities.